wind farm

An Càrr Dubh Wind Farm

We are delighted to share that the Scottish Government has approved our plans for the An Càrr Dubh Wind Farm, located approximately 6 km northwest of Inveraray and 4.5 km east of Dalavich.

Project timeline

  • Stage 1: Site Selection (12 months)

    Extensive research to identify suitable sites: positive indicators include good wind speed and minimal environmental and technical constraints.

  • Stage 2: Pre-Planning (6 - 12 months)

    We request the view of the Scottish Government, Argyll and Bute Council and other statutory and non-statutory bodies on the level of study required (known as "Scoping"). 

     

  • Stage 3: Submit Planning Application, and Decision (12 months)

    An application is submitted to the Scottish Government, accompanied by a comprehensive Environmental Impact Assessment Report showing the results of all studies undertaken.  

  • Stage 4: Construction (12 - 18 months)

    If An Càrr Dubh is approved, construction begins at least one year after consent.

    Construction typically takes 12-18 months and planning conditions are used to manage elements of construction.

  • Stage 5: Operation (35 - 40 years)

    The turbines are managed from a regionally based maintenance team, and operations are controlled by detailed planning conditions.

     

  • Stage 6: Decommissioning (12 months)

    At the end of the planning period, turbines are removed or an option could be taken to repower the project.