Statutory Consultation Feedback Form
Thursday 16 April to Thursday 28 May 2026
Mylen Leah Solar Farm is proposed between the villages of Seaton Ross, Melbourne, Laytham, Ellerton, East Cottingwith and Foggathorpe in the East Riding of Yorkshire.
If consented, Mylen Leah Solar Farm would have a capacity of approximately 500 megawatts (MW), generating enough clean electricity to power the equivalent of around 180,000 homes*, helping to strengthen the UK’s energy security.
Mylen Leah Solar Farm would establish a grid connection via underground cabling to National Grid Thornton Substation, which would transfer the electricity to the national electricity network. There is no battery energy storage system (BESS) included in the proposal, meaning all the electricity produced would go directly to the national grid.
You are now invited to take part in our statutory consultation, which runs from Thursday 16 April to Thursday 28 May 2026.
*The equivalent homes figure has been calculated in line with the latest DESNZ guidance / methodology published on 20th March 2026.
Calculation: Annual estimated generation MWh (Capacity, MW x hours in a year x solar capacity factor x DUKES electricity loss proportion) /Median Annual UK household electrical consumption, MWh (DESNZ stacked electricity consumption) = Homes Equivalent.