Planning application documents
In late February 2023, Statkraft submitted an Environmental Impact Assessment (EIA) Scoping Request to Planning and Environment Decisions Wales (PEDW). This request can be found in full here. The response to the Scoping Request will help to inform the contents of the full EIA.
The Scoping Request is also available on the PEDW Casework Portal under reference CAS-02171-X3W6Z0.
Trecwn Green Energy Hub - Scoping Report
Figure 1.1 Site Location
Figure 2.2 Planning Designations and History
Figure 2.3 Environmental Designations
Figure 3.1 Proposed Development Locations
Figure 3.3 Proposed Development Locations (aerial)
Figure 6.1 Landscape Designations
Figure 6.2 Site Area Analysis
Figure 6.3a Zone of Theoretical Visibility Bare Earth (Tip Height 150 m) Scale 1:300000
Figure 6.3b Zone of Theoretical Visibility Bare Earth and VP (Tip Height 150 m) Scale 1:150000
Figure 6.4 National Landscape Character Areas
Figure 6.5 National Marine Character Areas
Figure 6.6 PCC Landscape Character Areas
Figure 6.7 PCNP Character Areas
Figure 6.8 Seascape Character Areas
Figure 6.9 Cumulative Assessment
Figure 6.10 Zone of Theoretical Visibility - Solar Area
Figure 8.1 Ecological Designations
Figure 9.1 Hydrological Features
Figure 9.2 Fluvial Flood Risk Map
Figure 9.3 Surface Water Flood Risk Map
Figure 10.1 Bedrock Geology
Figure 10.2 Superficial Geology
Figure 10.3 Areas of Potentially Contaminated Land
Figure 11.1a Designated Cultural Heritage Assets
Figure 11.1b Designated Cultural Heritage Assets
Figure 11.2.1a and 2a Non-Designated Heritage Assets
Figure 11.2.1b and 2b Non-Designated Heritage Assets
Figure 12.1 Noise Receptors