Project documents
Project Documents
Giants Burn Request for Scoping Opinion_Feb 2024.pdf
Giant's Burn Scoping Report_20240214.pdf
Figure 1.1 - Site Location Plan.pdf
Figure 2.1 - Site Constraints Plan.pdf
Figure 2.2 - Indicative Site Layout Plan.pdf
Figure 2.3 - Proposed Access Route to Site.pdf
Figure 4.1 - Bareground ZTV Study.pdf
Figure 4.2 - Detailed ZTV Study.pdf
Figure 4.3 - Lighting ZTV Study.pdf
Figure 5.1 - Ecologically Designated Sites within 10km of the Proposed Development.pdf
Figure 6.1 - Designated Sites within 20km.pdf
Figure 6.2 - Survey Buffers used between April 2021 and August 2022.pdf
Figure 6.3 - Survey Buffers used between September 2022 and March 2023.pdf
Figure 6.4 - Survey Buffers used between April 2023 and August 2023.pdf
Figure 6.5 - Vantage Points and Viewsheds used between April 2021 and August 2022.pdf
Figure 6.6 - Vantage Points and Viewsheds used between September 2022 and March 2023.pdf
Figure 6.7 - Vantage Points and Viewsheds used between April 2023 and August 2023.pdf
Figure 7.1 - Constraints Map showing all Heritiage Assets within 1km of the Site.pdf
Figure 7.2 - Constraints Map showing all Designated Assets within 5km of the Site.pdf
Figure 7.3 - Constraints Map of Selected Designated Assets within 10km of the Site (with ZTV).pdf
Figure 8.1 - Noise Study Area_v0.2.pdf
Figure 9.1 - Hydrological Context Map.pdf
Figure 13.1 - Shadow Flicker Study Area_v0.3.pdf