Planning application documents
Section 36 Application Documents
Volume 1 - Cover, Preface and Contents
Volume 1 - Chapter 1 - Introduction
Volume 1 - Chapter 2 - Approach to the EIA
Volume 1 - Chapter 3 - Site Selection and Design Strategy
Volume 1 - Chapter 4 - Project Description
Volume 1 - Chapter 5 - Statutory and Policy Framework
Volume 1 - Chapter 6 - Landscape and Visual Amenity
Volume 1 - Chapter 7 - Hydrology Geology and Peat
Volume 1 - Chapter 8 - Ecology
Volume 1 - Chapter 9 - Ornithology
Volume 1 - Chapter 10 - Cultural Heritage
Volume 1 - Chapter 11 - Noise and Vibration
Volume 1 - Chapter 12 - Traffic and Transport
Volume 1 - Chapter 13 - Socio-Economics, Tourism and Recreation
Volume 1 - Chapter 14 - Other Issues
Volume 1 - Chapter 15 - Summary of Likely Significant Effects
Volume 2 - Cover, Preface and Contents
Volume 2 - Chapter 1 - Figure 1.1 - Site Location
Volume 2 - Chapter 3 - Figure 3.1a - Layout 1
Volume 2 - Chapter 3 - Figure 3.1b - Layout 2
Volume 2 - Chapter 3 - Figure 3.1c - Layout 3
Volume 2 - Chapter 3 - Figure 3.1d - Layout 4
Volume 2 - Chapter 3 - Figure 3.1e - Layout 5
Volume 2 - Chapter 3 - Figure 3.1f - Layout 6
Volume 2 - Chapter 4 - Figures 4.2a to 4.12 Typical Wind Turbine - 200m Tip Height to Proposed Substation Elevations
Volume 2 - Chapter 6 - Figure 6.1 - Landscape and Visual Impact Assessment Study Area
Volume 2 - Chapter 6 - Figure 6.2a - Blade Tip Height (180-200m) ZTV and Viewpoint Locations
Volume 2 - Chapter 6 - Figure 6.2b - Blade Tip Height (180-200m) ZTV, Visual Receptors and Viewpoint Locations within 20km
Volume 2 - Chapter 6 - Figure 6.2c - Blade Tip Height (180-200m) ZTV and Viewpoint Locations
Volume 2 - Chapter 6 - Figure 6.3a - Hub Height (102.5-122.5m) ZTV and Viewpoint Locations
Volume 2 - Chapter 6 - Figure 6.3b - Hub Height (102.5-122.5m) ZTV, Visual Receptors and Viewpoint Locations within 20km.pdf
Volume 2 - Chapter 6 - Figure 6.4 - Blade Tip Height (180-200m) and Hub Height (102.5-122.5m) Comparative ZTV and Viewpoint Locations.pdf
Volume 2 - Chapter 6 - Figure 6.5a - Landscape Character Types.pdf
Volume 2 - Chapter 6 - Figure 6.5b - Landscape Character Types with Blade Tip height (180-200m) ZTV.pdf
Volume 2 - Chapter 6 - Figure 6.6a - Designated Landscapes and Wild Land Areas.pdf
Volume 2 - Chapter 6 - Figure 6.6b - Designated Landscapes and Wild Land Areas with Blade Tip Height (180-200m) ZTV.pdf
Volume 2 - Chapter 6 - Figure 6.7a - Other Wind Farm Developments 60km.pdf
Volume 2 - Chapter 6 - Figure 6.7b - Other Wind Farm Developments 45km.pdf
Volume 2 - Chapter 6 - Figure 6.8 - CZTV Opeartional Wind Farms and Loch Liath.pdf
Volume 2 - Chapter 6 - Figure 6.9 - CZTV Opeartional and Consented Wind Farms and Loch Liath.pdf
Volume 2 - Chapter 6 - Figure 6.10 - CZTV Operational , Consented and Proposed Wind Farms and Loch Liath.pdf
Volume 2 - Chapter 6 - Figure 6.11 - CZTV Bhlaraidh, Corrimony and Loch Liath.pdf
Volume 2 - Chapter 6 - Figure 6.12 - CZTV Bhlaraidh, Bhlaraidh Extension, Corrimony and Loch Liath.pdf
Volume 2 - Chapter 6 - Figure 6.13 - CZTV Beinneun, Beinneun Extension, Millennium, Millennium South, Bunloinn, Tomchrasky and Loch Liath.pdf
Volume 2 - Chapter 7 - Figure 7.1 - Hydrological Setting.pdf
Volume 2 - Chapter 7 - Figure 7.2 - National Soil Map of Scotland.pdf
Volume 2 - Chapter 7 - Figure 7.3 - SNH Carbon and Peatland Map 2016.pdf
Volume 2 - Chapter 7 - Figure 7.4 - Superficial Geology.pdf
Volume 2 - Chapter 7 - Figure 7.5 - Bedrock Geology.pdf
Volume 2 - Chapter 7 - Figure 7.6 - Hydrology Features.pdf
Volume 2 - Chapter 7 - Figure 7.6a - Hydrology Features.pdf
Volume 2 - Chapter 7 - Figure 7.6b - Hydrology Features.pdf
Volume 2 - Chapter 7 - Figure 7.6c - Hydrology Features.pdf
Volume 2 - Chapter 7 - Figure 7.6d - Hydrology Features.pdf
Volume 2 - Chapter 7 - Figure 7.7 - Hydrogeological Regime.pdf
Volume 2 - Chapter 7 - Figure 7.8 - Depth of Penetration and Probe Locations.pdf
Volume 2 - Chapter 7 - Figure 7.8a - Depth of Penetration and Probe Locations.pdf
Volume 2 - Chapter 7 - Figure 7.8b - Depth of Penetration and Probe Locations.pdf
Volume 2 - Chapter 7 - Figure 7.9 - Estimated Peat Depth.pdf
Volume 2 - Chapter 7 - Figure 7.9a - Estimated Peat Depth.pdf
Volume 2 - Chapter 7 - Figure 7.9b - Estimated Peat Depth.pdf
Volume 2 - Chapter 7 - Figure 7.10 - Temporary Peat Storage Areas.pdf
Volume 2 - Chapter 7 - Figure 7.11 - Peat Restoration Areas.pdf
Volume 2 - Chapter 8 - Figure 8.1 - Ecology Survey Area.pdf
Volume 2 - Chapter 8 - Figure 8.2 - Desk Study Area and Designations within 10km.pdf
Volume 2 - Chapter 8 - Figure 8.3 - Phase 1 Habitat Survey Results upload.pdf
Volume 2 - Chapter 8 - Figure 8.4 - National Vegetation Classification (NVC) Survey Results upload.pdf
Volume 2 - Chapter 8 - Figure 8.5 - Areas of Guidance-Stated Potential Groundwater Dependency.pdf
Volume 2 - Chapter 8 - Figure 8.6 - Protected Species Survey Results.pdf
Volume 2 - Chapter 8 - Figure 8.7 - Bat Survey Area.pdf
Volume 2 - Chapter 8 - Figure 8.8 - Bat Survey Results.pdf
Volume 2 - Chapter 8 - Figure 8.9 - Proposed OREP Measures.pdf
Volume 2 - Chapter 9 - Figure 9.1 - Designated Sites within 20km.pdf
Volume 2 - Chapter 10 - Figure 10.1 - The Location of Heritage Assets in the Inner Study Area.pdf
Volume 2 - Chapter 10 - Figure 10.2 - The Location of Designated Heritage Assets in the Outer Study Area and Beyond.pdf
Volume 2 - Chapter 10 - Figure 10.3 - The Location of Visualisations to Inform the Assessment of Setting Change, Views of Urquhart Castle.pdf
Volume 2 - Chapter 11 - Figure 11.1 - Noise Locations and Noise Contours.pdf
Volume 2 - Chapter 12 - Figure 12.1 - Study Area.pdf
Volume 2 - Chapter 12 - Figure 12.2 - Traffic Count Locations.pdf
Volume 2 - Chapter 12 - Figure 12.3 - Accident Locations.pdf
Volume 2 - Chapter 12 - Figure 12.4 - Abnormal Invisible Load and Construction Vehicle Delivery Routes.pdf
Volume 2 - Chapter 13 - Figure 13.1 - Core Paths and Right of Ways within 15km of Site Boundary.pdf
ECU Letter Loch Liath Clarifications to NatureScot Maps and Cumulative Developments
Volume 3a - Cover, Preface and Contents
Volume 3a - Chapter 6 - Figure 6.14 - VP1- Affric Kintail Way near Braefield
Volume 3a - Chapter 6 - Figure 6.15 - VP2 - Meall Fuar Mhonaidh
Volume 3a - Chapter 6 - Figure 6.16 - VP3 - Balbeg
Volume 3a - Chapter 6 - Figure 6.17 - VP4 - Affric Kintail Way West of Cannich
Volume 3a - Chapter 6 - Figure 6.18 - VP5 - Coire Loch Trail Glen Affric
Volume 3a - Chapter 6 - Figure 6.19 - VP6 - B862 near Whitebridge_NS
Volume 3a - Chapter 6 - Figure 6.20 - VP7 - A833 near Balnagrantach
Volume 3a - Chapter 6 - Figure 6.21 - VP8 - B862 Suidhe Viewpoint
Volume 3a - Chapter 6 - Figure 6.22 - VP9 - Meall Mor above Glen Affric
Volume 3a - Chapter 6 - Figure 6.23 - VP10 - Creag Dhubh
ECU Letter Loch Liath Clarifications to NatureScot Maps and Cumulative Developments
Volume 3b - Cover, Preface and Contents
Volume 3b - Chapter 6 - Figure 6.24 - VP11 - Carn na Leitire
Volume 3b - Chapter 6 - Figure 6.25 - VP12 - Beinn a Bha ach Ard
Volume 3b - Chapter 6 - Figure 6.26 - VP13 - B852 Erchite Wood
Volume 3b - Chapter 6 - Figure 6.27 - VP14 - Meall Dubh
Volume 3b - Chapter 6 - Figure 6.28 - VP15 - Core Path Loch Affric
Volume 3b - Chapter 6 - Figure 6.29 - VP16 - B862 South of Dores
Volume 3b - Chapter 6 - Figure 6.30 - VP17 - Carn na Saobhaidhe
Volume 3b - Chapter 6 - Figure 6.31 - VP18 - Toll Creagach
Volume 3b - Chapter 6 - Figure 6.32 - VP19 - Sgurr nan Conbhairean
Volume 3b - Chapter 6 - Figure 6.33 - VP20 - Carn Dearg
Volume 3b - Chapter 6 - Figure 6.34 - AESLQ_05-WLA 07_Track near Alltbeithe
Volume 3b - Chapter 6 - Figure 6.35 - AESLQ_06_Core Path at Loch Coulavie
Volume 3b - Chapter 6 - Figure 6.36 - WLA06_Bealach Toll Easa
Volume 4a - Chapter 6 - Figure 6.14 - VP1 - Affric Kintail Way near Braefield -THC
Volume 4a - Chapter 6 - Figure 6.15 - VP02 - Meall Fuar Mhonaidh -THC
Volume 4a - Chapter 6 - Figure 6.16 - VP3 Balbeg -THC
Volume 4a - Chapter 6 - Figure 6.17 - VP4 - Affric Kintail Way West of Cannich -THC
Volume 4a - Chapter 6 - Figure 6.18 - VP5 - Coire Loch Trail Glen Affric -THC
Volume 4a - Chapter 6 - Figure 6.19 - VP6 - B862 near Whitebridge -THC
Volume 4a - Chapter 6 - Figure 6.20 - VP7 - A833 near Balnagrantach -THC
Volume 4a - Chapter 6 - Figure 6.21- VP8 - B862 Suidhe Viewpoint -THC
Volume 4a - Chapter 6 - Figure 6.22 - VP9 - Meall Mor, above Glen Affric -THC
Volume 4a - Chapter 6 - Figure 6.23 - VP10 - Creag Dhubh -THC
Volume 4a - Cover, Preface and Contents.pdf
Volume 4b - Cover, Preface and Contents
Volume 4b - Chapter 6 - Figure 6.24 - VP11 - Carn na Leitire -THC
Volume 4b - Chapter 6 - Figure 6.25 - VP12 - Beinn a Bha ach Ard -THC
Volume 4b - Chapter 6 - Figure 6.26 - VP13 - B852 Erchite Wood_THC
Volume 4b - Chapter 6 - Figure 6.27 - VP14 - Meall Dubh -THC
Volume 4b - Chapter 6 - Figure 6.28 - VP15 - Core Path Loch Affric -THC
Volume 4b - Chapter 6 - Figure 6.29 - VP16 - B862 South of Dores -THC
Volume 4b - Chapter 6 - Figure 6.30 - VP17 - Carn na Saobhaidhe -THC
Volume 4b - Chapter 6 - Figure 6.31 - VP18 -TollCreagach -THC
Volume 4b - Chapter 6 - Figure 6.32 - VP19 - Sgurr nan Conbhairean -THC
Volume 4b - Chapter 6 - Figure 6.33 - VP20 - CarnDearg -THC
Volume 5a - Cover, Preface and Contents
Volume 5a - Appendix 1.1 - Statement of Expertise
Volume 5a - Appendix 2.1 - Consultation Response Table
Volume 5a - Appendix 4.1 - Outline Construction Environmental Management Plan (CEMP)
Volume 5a - Appendix 4.2 - Schedule of Mitigation, Good Practice, Enhancement and Monitoring Measures
Volume 5a - Appendix 6.1 - LVIA Methodology
Volume 5a - Appendix 6.2 - ZTV Mapping and Visualisation Methodology
Volume 5a - Appendix 6.3 - Assessment of Effects on Special Landscape Qualitites (AESLQ)
Volume 5a - Appendix 6.4 - Wild Land Impact Assessment
Volume 5a - Appendix 6.5 - Aviation Lighting Impact Assessment
Volume 5a - Appendix 7.1 - Good Practice Methods
Volume 5a - Appendix 7.2 - Peat Survey Report
Volume 5a - Appendix 7.3 - Outline Peat Management Plan
Volume 5a - Appendix 7.4 Peat Landslide Hazard and Risk Assessment (PLHRA)
Volume 5a - Appendix 7.5 - Watercourse Crossing Inventory
Volume 5a - Appendix 8.1 - Desk Study and Legal Policy Context
Volume 5a - Appendix 8.2 - Habitats and Vegetation Survey Report
Volume 5a - Appendix 8.3 - Protected Species Survey Report
Volume 5a - Appendix 8.4 - Bat Survey Report
Volume 5a - Appendix 8.5 - Outline Restoration and Enhancement Plan (OREP)
Volume 5b - Appendix 9.1 - Ornithology Technical Appendix
Volume 5b - Appendix 9.2 - Collision Risk Modelling
Volume 5b - Appendix 9.5 - Outline Regional Eagle Conservation Management Plan
Volume 5b - Appendix 10.1 - Historic Environment Assessment
Volume 5b - Appendix 12.1 - Transport Assessment
Volume 5b - Appendix 13.1 - Outline Access Management Plan
Volume 5b - Appendix 13.2 - Loch Ness Wind Farms Business Survey Headlines
Volume 5b - Appendix 14.1 - Carbon Calculator Assessment
Volume 5b - Appendix 14.2 - Aviation Lighting and Mitigation Report
Volume 5b - Cover, Preface and Contents.pdf